news center
Production News Express
2024-01-10 views 195
On the morning of January 10, the "MAERSK REDWOOD", a 3,500TEU container ship built and delivered by our group's New Yangzi Shipbuilding for the shipowner Japan's LEPTA Company, unmoored and set sail from the shipyard dock and was put into operation of the MAERSK fleet.
"MAERSK REDWOOD" has a total length of 200 meters, a molded width of 36.4 meters, and a molded depth of 20.6 meters. It is classified into the ABS classification society. The ship was delivered via electronic signature. At about 10 a.m. on January 10, representatives from the shipowner, construction supervision team, ship inspection and shipyard gathered at the New Yangzi Shipbuilding Terminal to bid farewell to the maiden voyage.
2025.05.29
Delivery of 50,000DWT MR tanker "JAL KAILASH" built by Yangz…
2025.05.19
Delivery and Departure of the Second 8200TEU LNG (Membrane T…
2025.05.14
Delivery and Departure of The Fifth 50,000DWT MR tanker "INI…
2025.05.07
Delivery and Departure of Group's First 8200TEU LNG (Membran…
2025.05.05
Delivery and Departure of the Sixth 16,000 TEU LNG Dual-fuel…
2025.04.10
Delivery and Departure of one 50,000DWT MR tanker "DINO" bui…
2025.04.10
Delivery and Departure of the Fifth 16,000 TEU LNG Dual-fuel…
2025.04.08
Successful Delivery of 66000DWT bulk carrier "UM JIANGSU" bu…
2025.03.29
Delivery of First 50,000DWT MR tanker "JAL PRERANA" built by…
2025.03.24
Delivery and Departure of 4600 TEU Container Vessel "Xin Qin…